News, press, conferences, events, publications
"Bulletin of the Association of Drilling Contractors" №1, 2012
AUTOMATING THE MANAGEMENT OF DRILLING ENGINEERING WITHIN COMPLEX SYSTEM «DRILL WORKS PRODUCTION»
Farid, Farid A. – head of the drilling «TatNIPIneft», ffa@tatnipi.ru
Dec, Boris V. – head of the design of well construction "BelNIPIneft", b.detc@beloil.by
Palchunov, Valery P. – Cand.Tech.Sci., CEO of Modem Ltd., palchunov@gmail.com
Despite the notable success and increased use of information and communication technologies in drilling process automation field, many leading experts say about the deficit in informational technologies. Automation management system «Drill works production» (AMS DWP) developed by Modem Ltd. and successfully passed the practical approbation as for individual well construction and for mass construction of wells and cluster drilling originally designed for fill this information gap.The article describes innovative approaches implemented in the AMS DWP and directed to improve the level and quality of management decisions.
Keywords: automation, control systems, well construction, design institute, project documentation, project, order, estimate, engineering, drilling, and monitoring.